Project Overview
PROJECT: UTM – New Science Building
OWNER: University of Toronto Mississauga
APPROXIMATE VALUE: $12,000,000
DATE COMPLETED: June 2023
CONSULTANT / ENGINEER: Arup Canada Inc.
This new facility will also be the home of the Novo Nordisk Network for Healthy Populations, a high-performance computation data centre
and spaces for Facilities Management and Planning.
Net Electric in partnership with Walsh Group was responsible for the supply and installation of all electrical systems; indoor and out, lighting, emergency generator system, UPS network, life safety and security systems.
Net Electric’s scope also included the structured cabling, pathways, data centre hardware, wireless system and redundant network backbone system.

Project Overview
PROJECT: TRCA – New Sustainable Office
OWNER: Toronto and Region Conservation Authority
APPROXIMATE VALUE: $5,500,000
DATE COMPLETED: March 2023
CONSULTANT / ENGINEER: Mulvey & Banani International
The four-storey mass-timber office building will act as a living laboratory for developers, professionals, researchers,
and students, over 400 TRCA staff and provide development planning and permitting services for TRCA’s regulated areas
Net Electric in partnership with Eastern Construction was responsible for the supply and installation of all electrical systems; indoor and out, lighting, emergency generator system, fire alarm, shade control, CCTV and security systems. Included as well, were structured cabling, pathways, data centre hardware, wireless system and a redundant network backbone system.

Project Overview
PROJECT: Hydro One Operations Centre, Orillia
OWNER: Hydro One
APPROXIMATE VALUE: $4,050,000
DATE COMPLETED: September 2021
CONSULTANT / ENGINEER: Morrison Hershfield Limited
In conjunction with Ellis Don and Symtech Innovations, Net Electric was responsible for the entire Data Centre, Carrier Rooms, Emergency Power Management System and Office structured cabling platform which included all server and network equipment cabinets and racks, specialty power distribution units, fibreoptic raceways, underfloor cable supports, inter-cabinet and inter-room backbone and horizontal cabling – both optical fibre and Cat6a.All fibre cabling was either pre-terminated MPO-style or was fusion.

Project Overview
PROJECT: University of Toronto Chestnut
OWNER: University of Toronto
APPROXIMATE VALUE: $225,000
DATE COMPLETED: August 2019
CONSULTANT / ENGINEER: Net Electric Limited
Net Electric was responsible for the design of cable plant retrofit, Complete fibre optic & copper structured cable solution, and active residence during the entire project.
Net electric consulted with the University of Toronto for the wireless design and installation

Project Overview
PROJECT: OCAD University Fabrication Studios Renovations, Toronto
OWNER: OCAD University – Fabrication Studios
APPROXIMATE VALUE: $1,500,000
DATE COMPLETED: December 2019
CONSULTANT / ENGINEER: Morphosis / Teeple Architects / Two Row Architect, Toronto
The Fabrication Studios expansion was initiated to renovate existing studios, provide new equipment and technology, and improve energy efficiency to the building systems.
Net Electric Limited, in partnership with Morphosis and Eastern Construction, was responsible for upgrading levels 1 and 4 of the existing system. Upgrades were made to power distribution, lighting and fire alarm systems.
In addition, Net Electric Limited is a PANDUIT ® Certified Installer. Using our qualification, a PANDUIT® CAT 6 network system was installed on this project.

Project Overview
PROJECT: University of Toronto, Faculty of Medicine – MSB Lab & Support Room Renovations
OWNER: University of Toronto, Faculty of Medicine
APPROXIMATE VALUE: $4,900,000
DATE COMPLETED: July 2018
CONSULTANT / ENGINEER: WSP, Oakville
The project included major renovations of laboratories in the research tower and anatomy laboratories.
Net Electric Limited, in partnership with WSP and Eastern Construction, was responsible for installing the power supplies for the condenser units, AC units, exhaust fans. In addition, Net Electric supplied and installed the power distribution system, light fixtures, switchboard, and large 750kW gas generator.
Net Electric also supplied and installed the communication systems and REES monitoring system for the fridges, coolers and incubators in the laboratories.

Project Overview
PROJECT: Ontario Institute for Studies in Education (OISE) – Dr. E. Jackman Institute of Child Study Expansion
OWNER: University of Toronto OISE
APPROXIMATE VALUE: $1,800,000
DATE COMPLETED: September 2017
CONSULTANT / ENGINEER: Taylor Smyth Architects, Toronto
The expansion project spans over 3 floors and features a large pavilion, gym and auditorium. In addition to being a research-based teaching establishment, the institute provides community outreach programs in literacy and parenting.
Net Electric Limited, in partnership with the University of Toronto and Buttcon Limited, was responsible for the supply and installation of the security, AV, CCTV and communications systems.
Net Electric also supplied and installed the switchboard panels, decorative lighting fixtures, electrical outlets, and fire alarm systems.

Project Overview
PROJECT: Century Gardens Recreation Centre
OWNER: Corporation of the City of Brampton
APPROXIMATE VALUE: $1,800,000
DATE COMPLETED: December 2008
CONSULTANT / ENGINEER: Giffels Corporation, Toronto
The project consisted of several components that doubled the overall size of the centre. Some of the highlights
are a new full-size ice rink as well as the refurbishment of the existing rink, the renovation of the pool and lobby area and a new entrance and lobby.
Net Electric secured the electrical contract with PCL Constructors and was responsible for providing the distribution system, lighting system, fire alarm system, P/A system, audio-video system and extensive communication cabling systems.

Project Overview
PROJECT: St. John’s Rehab Hospital, Toronto
OWNER: St. John’s Rehab Hospital
APPROXIMATE VALUE: $500,000
DATE COMPLETED: March 2010
CONSULTANT / ENGINEER: MMM Group, Thornhill
Percon Construction subcontracted Net Electric to demolish and upgrade the building distribution system to allow for the upcoming 49,000 sq, ft expansion.
The upgraded distribution system included new switchboards, splitters, transformers, disconnects and feeders. The parties worked together to adhere to project specifications and meet the demanding timelines, all the time being mindful of the budget.

Project Overview
PROJECT: York Region Administrative Centre, Newmarket
OWNER: Regional Municipality of York
APPROXIMATE VALUE: $6,500,000
DATE COMPLETED: November 1992
CONSULTANT / ENGINEER: Mulvey & Banani International Inc., Toronto
Net Electric worked closely with Milne & Nicholas Limited to adhere to project deadlines and specifications. Net Electric was responsible for installing the lighting systems, distribution system, voice and data communications cabling, fire alarm system, generator system, security system, clock tower power and lighting, and a UPS system that also operates for the York Regional Police Headquarters and provisions for the 911 emergency response communications system.