Project Overview
PROJECT: Pickering Casino Resort
OWNER: Great Canadian Gaming Corporation, North York
APPROXIMATE VALUE: $1,500,000
DATE COMPLETED: Winter 2020
CONSULTANT / ENGINEER: H.H. Angus & Associates and Mitchell Partnership Inc., Toronto
The casino construction is part of Durham Live, a $2 billion, 240-acre, multi-use development that will lend to creating a premier entertainment, recreation and tourism district for the eastern region of the Toronto area.
For the ongoing first phase of the project, Net Electric Limited, in partnership with Brookfield, Chris Dikeakos Architects and CGL Architects, has been responsible for the supply and installation of control systems and mechanical wiring.
Net Electric is able to contribute value to the fast-paced requirements of this Design-Assist project using our expertise to ensure the various installations are completed and compliant with the necessary codes and standards.

Project Overview
PROJECT: Grand River Casino Expansion, Elora
OWNER: Great Canadian Gaming Corporation, North York
APPROXIMATE VALUE: $700,000
DATE COMPLETED: May 2019
CONSULTANT / ENGINEER: Salter Pilon Architecture, Barrie
The casino is part of the Grand River Raceway which is considered the live horse racing heartland of Ontario.
Net Electric Limited, in partnership with Matheson construction and Salter Pilon Architects, was responsible for the supply and installation of power, lighting, and fire alarm systems. This included all wiring installations and the installation of decorative lighting.
In addition, Net Electric Limited was responsible for connecting the upgraded slot machines in the casino.

Project Overview
PROJECT: Woodbine Slots Expansion Phase ‘A’
OWNER: Ontario Lottery & Gaming Corporation
APPROXIMATE VALUE: $1,800, 000
DATE COMPLETED: June 2011
CONSULTANT / ENGINEER: Hidi Rae Consulting Engineers Inc., Toronto
In May 2011 the Woodbine Entertainment Group completed a 27,400 sq/ft gaming floor expansion within the Woodbine Racetrack. The Ontario Lottery Gaming Corporation is responsible for a large portion of the construction in the newly created floor space. This includes: 1000 new slot machines, game video feeds, signage, lighting in OLG operated areas, and security in OLG operated areas.
Net Electric worked closely with Eastern Construction and OLG to ensure the timely installation of the expanded gaming floors OLG operated systems, all while the existing facility was fully operational. This encompassed systems such as power distribution for slot machines, lighting, complete communication system and security.

Project Overview
PROJECT: Woodbine Slots Casino & Race Track
OWNER: Woodbine Entertainment Group
APPROXIMATE VALUE: $4,700,000
DATE COMPLETED: May 2011
CONSULTANT / ENGINEER: HH Angus & Associates Limited, Toronto
Net Electric secured the electrical contract with Eastern Construction and worked closely with them and the Woodbine Entertainment Group to renovate the initial 27,400 sq/ft stage of the complex. The contract was to be completed while the existing facility was operational 24/7/365. The project was comprised of several different sectors including the 188 seat Willows Restaurant, two service bars, MIS room, audio-video room, smoking shelter, redemption area and the greatly expanded gaming floor.
Net electric was responsible for the demolition of the existing electrical systems and for providing the new: distribution system, lighting system, communication systems, generator system, and fire alarm system.